Actions
Bug #3989
open[Workbench] [DRAFT] Fix clock/node time reporting on Workbench pipeline page
Status:
New
Priority:
Normal
Assigned To:
-
Category:
Workbench
Target version:
-
Start date:
Due date:
% Done:
0%
Estimated time:
(Total: 0.00 h)
Story points:
-
Description
Including:
- No figures should include time spent queued
- When jobs are reused in a pipeline, time of reused jobs should be reported separately, and not included in any of the pipeline's other time stats
- Pipeline/job timing figures should not mislabel "sum of wallclock time of each task" as "CPU time"
- Fix reporting for failed jobs (see #5651 notes)
Updated by Tom Clegg almost 10 years ago
- Subject changed from [Workbench] Pipeline/job timing figures should not mislabel "sum of wallclock time of each task" as "CPU time" to [Workbench] [DRAFT] Fix clock/node time reporting on Workbench pipeline page
- Description updated (diff)
- Category set to Workbench
Updated by Brett Smith over 9 years ago
- Description updated (diff)
- Story points deleted (
0.5)
Updated by Ward Vandewege over 3 years ago
- Target version deleted (
Arvados Future Sprints)
Actions